Business
Capital Bids
Massport has introduced online bidding
All new bids for C.149 and C.30 projects Consultant Professional Services can be found on the Massport Bid Express website. The construction projects listed below under Advertised Contracts that are C.149 or C.30 have already been advertised. No hard copies of the bidding information, Proposal, Plans and Specifications, Addenda, or other material is available. Nor will Massport accept hard copy bids for these projects. Bidding on these projects is completely online.
See Massport's upcoming projects in design and construction for the next 6 to 9 months across our facilities.
All bidders need to be registered with Bid Express to submit or respond to Bids. Please refer to the new Bid Express New Vendor Instructions.
Advertised Contracts
Project # | Opportunity Type | Project Title | Due Date Sort ascending | Estimate |
---|---|---|---|---|
L1752 General | Construction 149/30 | L1752 ( General) , LOGAN CENTRAL GARAGE CONCRETE AND STRUCTURAL IMPROVEMENT, EAST BOSTON, MASSACHUSETTS | 02/19/2025 | $1,400,000 |
L1807-C1 General | Construction 149/30 | AARF FIRE STATION IMPROVEMENTS | 01/22/2025 | $1,512,203 |
M647 | Construction Manager At Risk | M647, FLYNN CRUISEPORT MODERNIZATION, BOSTON | 01/09/2025 | $30,000,000 |
H319-C2 | Contractor/Vendor RFQ | H319-C2 RFQ TRADE CONTRACTORS CIVIL AIR TERMINAL ARCHITECTURAL & SECURITY UPGRADES | 01/09/2025 | $4,857,297 |
M770 | Professional Consultant | NORTH JETTY REHABILITATION, MASSPORT MARINE TERMINAL, FID KENNEDY AVENUE, SOUTH BOSTON, MASSACHUSETTS | 01/09/2025 | $1,500,000 |
L1807-C1 SUB | Construction 149/30 | AARF FIRE STATION IMPROVEMENTS | 01/08/2025 | $1,512,203 |
A465 | Professional Consultant | A465 – AIRCRAFT RESCUE AND FIRE FIGHTING (ARFF) FLUORINE-FREE FOAM (F3) TRANSITION | 12/12/2024 | $1,500,000 |
L1752 (SUB) | Construction 149/30 | L1752, (SUB) LOGAN CENTRAL GARAGE CONCRETE AND STRUCTURAL IMPROVEMENT,EAST BOSTON, MASSACHUSETTS | 12/04/2024 | $1,400,000 |
L1366 | Construction Manager At Risk | L1366 – NORTH SERVICE AREA OPTIMIZATION BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 11/21/2024 | $300,000,000 |
AP2419-C1 | Construction 149/30 | EMERGENCY WATERLINE REPAIRS, ALL MASSPORT PROPERTIES | 11/20/2024 | $2,900,000 |
L1832-C1 General | Construction 149/30 | L1832-C1, EXISTING GBD DOOR REPLACEMENT AND SIDA GATE, NORTH SERVICE AREA EAST BOSTON, MA 02128 | 11/13/2024 | $3,617,737 |
L1832-C1 SUB | Construction 149/30 | L1832-C1, EXISTING GBD DOOR REPLACEMENT AND SIDA GATE, NORTH SERVICE AREA EAST BOSTON, MA 02128 | 10/30/2024 | $3,617,737 |
A433-C3 | Construction 149/30 | A433-C3 PIERS PARK II SAILING CENTER SOLAR, EAST BOSTON, MASSACHUSETTS | 10/16/2024 | $401,000 |
L1749-C2 GENERAL | Construction 149/30 | SECURITY TURNSTILE REPLACEMENT AT PRESCOTT STREET, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 10/09/2024 | $352,000 |
A433-C2 | Construction 149/30 | HANSCOM NORTH AIRFIELD HANGAR SOLAR, BEDFORD, MASSACHUSETTS | 10/09/2024 | $604,000 |
L1773 | Construction Manager At Risk | L1773 – A TO B POST SECURITY CONNECTOR, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 10/03/2024 | $215,000,000 |
L1599-C2 General | Construction 149/30 | L1599-C2 General LOC MISCELLANEOUS RENOVATIONS, EAST BOSTON, MASSACHUSETTS | 09/25/2024 | $1,074,983 |
L1749-C2 SUB | Construction 149/30 | SECURITY TURNSTILE REPLACEMENT AT PRESCOTT STREET, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 09/25/2024 | $352,000 |
M699 | Professional Consultant | M699 – NEW MAINTENANCE BUILDING, CONLEY CONTAINER TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 09/19/2024 | $30,000,000 |
AP2500 | Construction 149/30 | Authority wide Renewable Energy Maintenance, ALL MASSPORT LOCATIONS BEDFORD, BOSTON, FRAMINGHAM AND WORCESTER, MASSACHUSETTS | 09/18/2024 | $1,500,000 |
M716-C1 | Construction 149/30 | M716-C1, BERTH 12 RAIL REHABILITATION, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 09/18/2024 | $15,800,000 |
L1840 | Professional Consultant | L1840 – LOGAN NPDES PERMIT INFRASTRUCTURE PROGRAM, LOGAN INTERNATIONAL AIRPORT, ONE HARBORSIDE DRIVE, EAST BOSTON, MASSACHUSETTS | 09/12/2024 | $5,000,000 |
L1629 | Contractor/Vendor RFQ | L1629 FRAMINGHAM LOGAN EXPRESS GARAGE EXPANSION-TRADE CONTRACTORS | 09/12/2024 | $38,000,000 |
L1599-C2 SUB | Construction 149/30 | L1599-C2 SUB LOC MISCELLANEOUS RENOVATIONS, EAST BOSTON, MASSACHUSETTS | 09/11/2024 | $1,074,983 |
A433-C1 General | Construction 149/30 | HANSCOM AIRCRAFT RESCUE FIRE FIGHTING (ARFF) AND US CUSTOMS AND BORDER PROTECTION (CBP) FACILITY SOLAR PANELS | 08/28/2024 | $314,000 |
AP2416-C1 | Construction 149/30 | AP2416-C1 HANSCOM/ WORCESTER AIRFIELD MAINTENANCE TERM CONTRACT | 08/28/2024 | $1,750,000 |
L1697-C4 | Contractor/Vendor RFQ | L1697-C4 TERMINAL B ROADWAY & GARAGE OPTIMIZATION, FIRE PROTECTION,CMAR TRADE CONTRACTORS | 08/22/2024 | $400,000 |
AP2417 | Construction 149/30 | AP2417, FY 2025 TO 2028 ELEVATOR, ESCALATOR, AND MOVING WALKWAY MAINTENANCE TERM CONTRACT, ALL MASSPORT PROPERTIES, BOSTON, BEDFORD, WORCESTER, AND FRAMINGHAM, MASSACHUSETTS | 08/21/2024 | $21,500,000 |
LP2500-C1 | Construction 149/30 | LP2500-C1, FY2025-2027 RUNWAY/TAXIWAY SAFETY AREA INFIELD MAINTENANCE TERM CONTRACT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 08/21/2024 | $1,000,000 |
L1856-C1 | Construction 149/30 | L1856-C1, PEER TO PEER CAR SHARING LOT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 08/14/2024 | $484,000 |
A433-C1 SUB | Construction 149/30 | HANSCOM AIRCRAFT RESCUE FIRE FIGHTING (ARFF) AND US CUSTOMS AND BORDER PROTECTION (CBP) FACILITY SOLAR PANELS | 08/14/2024 | $314,000 |
L1629-CX CMAR TRADES | Contractor/Vendor RFQ | L1629-CX CMAR TRADE CONTRACTORS FRAMINGHAM LOGAN EXPRESS GARAGE EXPANSION 11 BURR STREET, FRAMINGHAM MA | 08/08/2024 | $38,000,000 |
L1809 | Construction Manager At Risk | L1809 – CMAR TERMINAL C IMPROVEMENTS, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS |
08/01/2024 | $210,000,000 |
W314-C1 | Construction 149/30 | W314-C1 WORCESTER TERMINAL ROADWAY REHABILITATION, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 07/31/2024 | $1,731,324 |
A458 | Professional Consultant | THIRD PARTY FIRE PROTECTION TERM CODE REVIEW CONSULTING SERVICES | 07/25/2024 | $1,000,000 |
L1354-C9 GENERAL | Construction 149/30 | CENTRAL HEATING PLANT BOILER #3 REPLACEMENT 600 TERMINAL E EXTENSION LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA | 07/24/2024 | $13,300,000 |
H323 | Professional Consultant | H323, HANSCOM WATER DISTRIBUTION SYSTEM UPGRADES, LAURENCE G. HANSCOM FIELD - 200 HANSCOM DR, BEDFORD, MA | 07/18/2024 | $4,500,000 |
A442-C1 General | Construction 149/30 | AUTHORITY WIDE ELEVATOR, ESCALATOR AND MOVING WALKWAY PROGRAM, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 07/17/2024 | $14,600,000 |
L1630 | Professional Consultant | Braintree Logan Express Garage, Braintree, Massachusetts | 07/11/2024 | $2,000,000 |
A442-C1 SUB | Construction 149/30 | (FSB Electrical) AUTHORITY WIDE ELEVATOR, ESCALATOR AND MOVING WALKWAY PROGRAM, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 07/10/2024 | $97,568 |
L1760-C1 General | Construction 149/30 | ARFF HQ CONDENSER REPLACEMENT | 07/10/2024 | $1,620,000 |
W320 | Professional Consultant | WORCESTER PERMANENT (OVERFLOW) PARKING LOT, WORCESTER, MASSACHUSETTS | 06/27/2024 | $1,500,000 |
M677-C1 | Construction 149/30 | MASSPORT HAUL ROAD PAVEMENT REHABILITATION, SEAPORT DISTRICT, SOUTH BOSTON, MASSACHUSETTS | 06/26/2024 | $1,400,000 |
M693-C1 General | Construction 149/30 | M693-C1, CARD READERS AND CAMERAS FOR ELECTRICAL INFRASTRUCTURE AT CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 06/26/2024 | $550,000 |
L1354-C9 SUB | Construction 149/30 | L1354-C9, CENTRAL HEATING PLANT BOILER #3 REPLACEMENT 600 TERMINAL E EXTENSION LOGAN INTERNATIONAL AIRPORT EAST BOSTON, MA | 06/26/2024 | $13,300,000 |
L1760-C1 SUB | Construction 149/30 | ARFF HQ CONDENSER REPLACEMENT | 06/26/2024 | $1,620,000 |
L1830 | Professional Consultant | DANVERS LOGAN EXPRESS, 100 INDEPENDENCE WAY, DANVERS, MASSACHUSETTS 01923 | 06/20/2024 | $3,000,000 |
L1469 | Professional Consultant | NET ZERO LIGHTING, LOGAN INTERNATIONAL AIRPORT – LANDSIDE, EAST BOSTON, MA 02128 | 06/13/2024 | $800,000 |
H319-C1 | Construction Manager At Risk | Civil Air Terminal Architectural & Security Upgrades CM@R RFQ | 06/13/2024 | $13,500,000 |
M693-C1 SUB | Construction 149/30 | M693-C1, CARD READERS AND CAMERAS FOR ELECTRICAL INFRASTRUCTURE AT CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS, | 06/12/2024 | $550,000 |
L1468-C1 General | Construction 149/30 | TERMINAL B GENERATOR REPLACEMENT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 06/12/2024 | $3,700,000 |
L1821 | Contractor/Vendor RFQ | L1821 TRADE CONTRACTORS TERMINAL E OPERATIONAL IMPROVEMENTS | 06/06/2024 | $156,000,000 |
M672-C1R | Construction 149/30 | Conley Terminal Cameras | 06/05/2024 | $280,400 |
A456 | Professional Consultant | FY24–26 PROJECT AND PROGRAM MANAGEMENT SUPPORT SERVICES AT ALL MPA FACILITIES | 05/30/2024 | $3,000,000 |
L1468-C1 SUB | Construction 149/30 | TERMINAL B GENERATOR REPLACEMENT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 05/29/2024 | $3,700,000 |
A457 | Professional Consultant | MEP ENGINEERING SERVICES. | 05/23/2024 | $1,500,000 |
L916-C1 | Construction 149/30 | INSTALL AIRFIELD DUCTBANK FROM TERMINAL B/C ALLEYWAY TO TAXIWAY M AT TAXIWAY C, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 05/22/2024 | $4,400,000 |
L1707-C1 | Construction 149/30 | REHABILITATION OF TAXIWAY BRAVO NORTH, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS |
05/22/2024 | $9,319,000 |
L1599-C3 General | Construction 149/30 | Logan Office Center Fitness Center Renovation | 05/15/2024 | $2,530,213 |
L1566-C1(R) | Construction 149/30 | RUNWAY 4R-22L UPGRADE LIGHTING TO LED AND CABLE RE-CIRCUITRY, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS |
05/15/2024 | $3,115,795 |
A406-S2 | Professional Consultant | INTEGRATED MASTER SCHEDULE & CONSULTING SERVICES, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MA | 05/09/2024 | $2,000,000 |
M712 | Professional Consultant | MARITIME PARK IMPROVEMENTS, D STREET AND NORTHERN AVENUE, SOUTH BOSTON, MASSACHUSETTS | 05/09/2024 | $1,000,000 |
L1821 | Contractor/Vendor RFQ | TRADE CONTRACTORS TERMINAL E OPERATIONAL IMPROVEMENTS | 05/02/2024 | $156,000,000 |
A460 | Professional Consultant | DIGITAL BUILDING DATA CAPTURE, AUTHORITYWIDE, LOGAN OFFICE CENTER, EAST BOSTON, MA 02128 | 05/02/2024 | $4,000,000 |
L1599-C3 SUB | Construction 149/30 | LOC FITNESS CENTER RENOVATION, EAST BOSTON | 05/01/2024 | $2,530,213 |
A461 | Professional Consultant | BUILDING SUSTAINABILITY & EFFICIENCY IMPROVEMENTS | 04/25/2024 | $1,500,000 |
AP2404-C1R | Construction 149/30 | PUMP & MOTOR SERVICE AND MAINTENANCE TERM CONTRACT, BOSTON, BEDFORD, MASSACHUSETTS | 04/24/2024 | $400,000 |
L1653 | Construction 149/30 | REHABILITATE TAXIWAY N FROM RUNWAY 15R-33L TO RUNWAY 22L, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 04/24/2024 | $20,000,000 |
M672-C1 | Construction 149/30 | CONLEY TERMINAL SECURITY CAMERAS, SOUTH BOSTON, MASSACHUSETTS | 04/24/2024 | $275,000 |
M549-C2 | Construction 149/30 | CONLEY TERMINAL STORAGE – PHASE 2, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 04/24/2024 | $42,000,000 |
L1765-C1 | Construction 149/30 | REPLACE LAND AND HOLD SHORT OPERATIONS (LAHSO) LIGHTING SYSTEM, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 04/17/2024 | $1,500,000 |
L1773-C1 GENERAL | Construction 149/30 | TERMINAL A GROUND BOARDING | 04/10/2024 | $591,584 |
L1686 | Contractor/Vendor RFQ | TRADE CONTRACTORS AIR TRAFFIC CONTROL TOWER (ATCT) IMPROVEMENTS – PHASE 1 | 04/04/2024 | $12,000,000 |
M658 | Professional Consultant | BOSTON FISH PIER RESTORATION AND REHABILITATION, BOSTON FISH PIER, SOUTH BOSTON, MASSACHUSETTS | 04/04/2024 | $5,000,000 |
M728 | Professional Consultant | CONLEY CONTAINER TERMINAL WATER DISTRIBUTION SYSTEM IMPROVEMENTS, CONLEY TERMINAL, 700 SUMMER STREET, SOUTH BOSTON, MASSACHUSETTS | 03/28/2024 | $4,000,000 |
L1773-C1 SUB | Construction 149/30 | TERMINAL A GROUND BOARDING | 03/27/2024 | $591,584 |
L1566-C1 | Construction 149/30 | RUNWAY 4R-22L UPGRADE LIGHTING TO LED, CABLE RE-CIRCUITRY, EDGE LIGHT INFRASTRUCTURE REPLACEMENT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 03/20/2024 | $6,001,205 |
W269-C1 | Construction 149/30 | RUNWAY 11 DEPARTURE END EMAS REPLACEMENT (RUNWAY 29 END), WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 03/20/2024 | $1,300,000 |
M751 | Professional Consultant | M751 CEC WIND TECHNOLOGY TESTING CENTER EXPANSION, CHARLESTOWN, MASSACHUSETTS |
03/14/2024 | $80,000,000 |
AP2415-C1 | Construction 149/30 | TERM TRAFFIC SIGNALS & CONTROLS, EAST BOSTON AND SOUTH BOSTON MA | 03/13/2024 | $575,000 |
H288-C2 | Construction 149/30 | RUNWAY 5-23 (NORTH OF RW 11-29) REHABILITATION, BEDFORD, MASSACHUSETTS | 03/13/2024 | $4,000,000 |
L1662-C1 General | Construction 149/30 | L1662-C1 LOGAN SOUND INSULATION PROGRAM, WINTHROP & REVERE | 03/06/2024 | $988,154 |
AP2412-C1 | Construction 149/30 | TERM NON AIRSIDE PAVING REPAIRS, BOSTON, BEDFORD, BRAINTREE, CHELSEA, FRAMINGHAM, PEABODY, WORCESTER AND WOBURN, MASSACHUSETTS | 03/06/2024 | $3,000,000 |
L1686 | Contractor/Vendor RFQ | TRADE CONTRACTORS L1686 AIR TRAFFIC CONTROL TOWER (ATCT) IMPROVEMENTS – PHASE 1 | 02/29/2024 | $12,000,000 |
L1694-C4 General | Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 78, AIRPORT RESCUE AND FIRE FIGHTING FACILITY, 162 HARBORSIDE DR., BOSTON, MASSACHUSETTS | 02/28/2024 | $3,850,000 |
AP2413-C1 | Construction 149/30 | LOW VOLTAGE / FIBER OPTIC INSTALLATION, REPAIR AND MAINTENANCE CONTRACT, AUTHORITY WIDE - ALL FACILITIES | 02/28/2024 | $3,375,000 |
AP2414-C1 | Construction 149/30 | FY 24-27 TERM VEGETATION MANAGEMENT - L.G. HANSCOM FIELD, BEDFORD MA AND WORCESTER REGIONAL AIRPORT, WORCESTER, MA | 02/28/2024 | $1,000,000 |
M705-C2 General Contract | Construction 149/30 | M705-C2, ROOF REPLACEMENT AND ASSOCIATED WORK AT MPA FISH PIER, BOSTON FISH PIER, EAST AND WEST BUILDINGS, 212 NORTHERN AVENUE, SOUTH BOSTON, MASSACHUSETTS | 02/21/2024 | $14,074,000 |
H213-C1 General | Construction 149/30 | H213-C1, SALT STORAGE FACILITY, LAURENCE G. HANSCOM FIELD AIRPORT, 200 HANSCOM DR., BEDFORD, MA, SALT STORAGE FACILITY, LAURENCE G. HANSCOM FIELD AIRPORT, 200 HANSCOM DR., BEDFORD, MA | 02/21/2024 | $2,708,000 |
M419-C1(R) | Construction 149/30 | SEAPORT DISTRICT CAMERAS, SOUTH BOSTON, MASSACHUSETTS | 02/21/2024 | $1,423,000 |
L1697-CX TRADE CONTRACTORS | Contractor/Vendor RFQ | TRADE CONTRACTORS L1697-CX TERMINAL B ROADWAY & GARAGE OPTIMIZATION | 02/15/2024 | $9,520,000 |
L1694-C4 SUB | Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 78, AIRPORT RESCUE AND FIRE FIGHTING FACILITY, 162 HARBORSIDE DR., BOSTON, MASSACHUSETTS | 02/14/2024 | $3,850,000 |
A413-C1 | Construction 149/30 | FRAMINGHAM LOGAN EXPRESS OVERFLOW LOT REVENUE CONTROLS | 02/07/2024 | $1,065,000 |
M705-C2 SUB | Construction 149/30 | M705-C2, ROOF REPLACEMENT AND ASSOCIATED WORK AT MPA FISH PIER, BOSTON FISH PIER, EAST AND WEST BUILDINGS, 212 NORTHERN AVENUE, SOUTH BOSTON, MASSACHUSETTS | 02/07/2024 | $14,074,000 |
L1662-C1 SUB | Construction 149/30 | MPA CONTRACT NO. L1662-C1 Logan Sound Insulation Program Revere & Winthrop, MASSACHUSETTS | 02/07/2024 | $988,154 |
H213-C1 SUB | Construction 149/30 | H213-C1, SALT STORAGE FACILITY, LAURENCE G. HANSCOM FIELD AIRPORT, 200 HANSCOM DR., BEDFORD, MA | 02/07/2024 | $2,708,000 |
L1633 | Construction 149/30 | R/W 9-27 Safety Area Improvements Design Build Entity Letter of Interest | 01/31/2024 | $115,000,000 |
LP2400-C1 | Construction 149/30 | LOGAN AIRFIELD PAVEMENT REPAIRS TERM CONTRACT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 01/31/2024 | $5,000,000 |
W297-C1 General | Construction 149/30 | W297-C1, WORCESTER AIRPORT SECURITY CHECKPOINT IMPROVEMENTS, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS. | 01/31/2024 | $2,050,000 |
M707-C2 General | Construction 149/30 | VARIABLE MESSAGING SIGN, WORLD TRADE CENTER AVENUE AND SUMMER STREET, SOUTH BOSTON, MASSACHUSETTS | 01/10/2024 | $805,000 |
L1746 | Professional Consultant | FIRE BOAT DOCK AND FERRY TERMINAL DOCK REHABILITATION AND ELECTRICAL UPGRADES | 01/04/2024 | $1,000,000 |
W297-C1 SUB | Construction 149/30 | WORCESTER AIRPORT SECURITY CHECKPOINT IMPROVEMENTS, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 01/03/2024 | $2,050,000 |
A450 | Professional Consultant | AUTHORITY-WIDE ELEVATOR, ESCALATOR AND MOVING WALKWAY MODERNIZATION PROGRAM, BOSTON, BEDFORD AND WORCESTER, MASSACHUSTTS | 12/21/2023 | $2,000,000 |
A430-C1 | Construction 149/30 | PARKING FACILITIES COUNTERS AND SIGNAGE. LOGAN AIRPORT EAST BOSTON, MASSACHUSETTS | 12/20/2023 | $4,100,000 |
L1781 | Professional Consultant | LOGAN HVAC REPLACEMENT PROGRAM, LOGAN INTERNATIONAL AIRPORT, BOSTON, MASSACHUSETTS | 12/14/2023 | $5,000,000 |
M724 | Professional Consultant | M724 BERTHS 10, 11 & 12 ENHANCEMENT AND RELATED LOW-PROFILE STS CRANE PROCUREMENT, CONLEY TERMINAL, 700 SUMMER STREET, SOUTH BOSTON, MASSACHUSETTS | 12/14/2023 | $50,000,000 |
M707-C2 SUB | Construction 149/30 | VARIABLE MESSAGING SIGN, WORLD TRADE CENTER AVENUE AND SUMMER STREET, SOUTH BOSTON, MASSACHUSETTS | 12/13/2023 | $138,000 |
L1833 | Professional Consultant | CARGO THROUGHPUT FACILITY, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 12/07/2023 | $30,000,000 |
L1686 | Construction Manager At Risk | AIR TRAFFIC CONTROL TOWER (ATCT) IMPROVEMENTS, AT BOSTON LOGAN INTERNATIONAL AIRPORT. | 12/07/2023 | $35,000,000 |
LP2401-C1 | Construction 149/30 | FY2024-2027, SKILLED TRADES MAINTENANCE CONTRACT FOR CARGO BUILDING NOS. 56, 57, 58, 62, and 63, GREEN BUS DEPOT BUILDING 53, AND OFFICE BUILDING NOS. 7 & 11, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON MASSACHUSETTS 02128 | 12/06/2023 | $1,500,000 |
M717 | Professional Consultant | CRANE 3 & 4 TROLLEY RAIL AND FESTOON SYSTEM REPLACEMENT | 11/16/2023 | $1,000,000 |
AP2410-C1 | Construction 149/30 | OVERHEAD DOOR REPAIR - TERM CONTRACT, ALL MASSPORT PROPERTIES, BEDFORD, BOSTON, AND WORCESTER, MASSACHUSETTS | 11/15/2023 | $500,000 |
M625-C2 | Construction 149/30 | CRUISEPORT PIER REHABILITATION, FLYNN CRUISEPORT BOSTON, 1 BLACK FALCON AVENUE, SOUTH BOSTON, MASSACHUSETTS | 11/15/2023 | $13,384,000 |
M687 | Professional Consultant | MAINTENANCE DREDGING CONSULTING SERVICES, FLYNN CRUISEPORT BOSTON AND MASSPORT FIRE DOCK, SOUTH BOSTON AND EAST BOSTON, MASSACHUSETTS | 11/09/2023 | $750,000 |
AP2409-C1 | Construction 149/30 | AUTOMATIC DOOR REPAIR - TERM CONTRACT, ALL MASSPORT PROPERTIES, BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN, AND WORCESTER, MASSACHUSETTS | 11/08/2023 | $5,000,000 |
AP2208-C1 | Construction 149/30 | TERM FLOORING REPAIRS, BOSTON, BEDFORD, AND WORCESTER MASSACHUSETTS | 11/08/2023 | $2,000,000 |
L1697 | Construction Manager At Risk | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION | 11/02/2023 | $35,000,000 |
AP2206-C1 | Construction 149/30 | AUTHORITY WIDE INSULATION TERM CONTRACT, ALL MPA FACILITIES BOSTON, BEDFORD, PEABODY, BRAINTREE, FRAMINGHAM AND WORCESTER MASSACHUSETTS | 11/01/2023 | $150,000 |
M419-C1 | Construction 149/30 | SEAPORT DISTRICT CAMERAS, SOUTH BOSTON, MASSACHUSETTS | 11/01/2023 | $1,985,000 |
M549-C1 | Construction 149/30 | CONLEY TERMINAL STORAGE – PHASE 1, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 10/25/2023 | $4,300,000 |
AP2407C1 | Construction 149/30 | AVIATION TERM WELDING – BUILDINGS, BOSTON, BEDFORD, WORCESTER | 10/25/2023 | $150,000 |
L1740-C1R | Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 10/25/2023 | $5,500,000 |
A288-C11 | Construction 149/30 | INTERIOR & EXTERIOR SIGNAGE - TERM CONTRACT, ALL MASSPORT PROPERTIES, BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN, AND WORCESTER MASSACHUSETTS | 10/18/2023 | $1,500,000 |
W316-C1 | Construction 149/30 | OVERFLOW PARKING LOT, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 10/18/2023 | $1,000,000 |
AP2408-C1 | Construction 149/30 | AUTHORITY WIDE TERM WELDING & METAL FABRICATION, BOSTON – NON BUILDING, BEDFORD, WORCESTER, MASSACHUSETTS | 10/11/2023 | $750,000 |
L1740-C1R SUB | Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 10/11/2023 | $5,500,000 |
M549-C1 | Construction 149/30 | CONLEY TERMINAL STORAGE – PHASE 1, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 10/11/2023 | $4,300,000 |
L1638-C1 | Construction 149/30 | SITE PREPARTION FOR CNG FUELING STATION RELOCATION, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 09/27/2023 | $1,500,000 |
AP2406 | Professional Consultant | AP2406 TERM STORMWATER PERMIT COMPLIANCE AND POTABLE WATER CONSULTANT SERVICES | 09/21/2023 | $3,000,000 |
W306 | Professional Consultant | FEDERALLY FUNDED AIRFIELD CAPITAL IMPROVEMENT PROJECTS – DESIGN AND CONSTRUCTION PHASE SERVICES, WORCESTER REGIONAL AIRPORT, WORCESTER, MASSACHUSETTS | 09/21/2023 | $1,500,000 |
M658-C1 | Construction 149/30 | STRUCTURAL REPAIRS, BOSTON FISH PIER, SOUTH BOSTON, MA | 09/20/2023 | $171,000 |
L1366-D2 | Professional Consultant | NORTH SERVICE AREA GREEN BUS DEPOT REPURPOSING, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 09/14/2023 | $15,000,000 |
L1697-C2 | Construction 149/30 | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION - RIDE APP PHASE II, LOGAN INTERNATIONAL AIRPORT | 09/13/2023 | $1,200,000 |
AP2404-C1 | Construction 149/30 | PUMP & MOTOR SERVICE AND MAINTENANCE TERM CONTRACT, BOSTON, BEDFORD, MASSACHUSETTS | 09/13/2023 | $375,000 |
AP2405-C1 | Construction 149/30 | HIGH VOLTAGE ELECTRICAL MAINTENANCE TERM CONTRACT, ALL MASSPORT LOCATIONS, BEDFORD, BOSTON, FRAMINGHAM, PEABODY, WOBURN, AND WORCESTER, MASSACHUSETTS | 09/06/2023 | $2,880,000 |
L1697-C2 | Construction 149/30 | TERMINAL B ROADWAY AND GARAGE OPTIMIZATION - RIDE APP PHASE II, LOGAN INTERNATIONAL AIRPORT | 08/30/2023 | $1,200,000 |
M658-C2 | Construction 149/30 | General Contractor: BOSTON FISH PIER DOOR REHABILITATION, 212 NORTHERN AVENUE, BOSTON, MASSACHUSETTS | 08/23/2023 | $900,000 |
M734 | Professional Consultant | M734 – SUSTAINABLE VEHICLE AND EQUIPMENT FUELING INFRASTRUCTURE - CONLEY TERMINAL, CRUISE TERMINAL, FISH PIER AND EAST BOSTON PARK MAINTENANCE FACILITIES, SOUTH AND EAST BOSTON, MASSACHUSETTS | 08/17/2023 | $2,000,000 |
L1694-C3 | Construction 149/30 | General Contractor: PARTIAL ROOF REPLACEMENT AND ASSOCIATED WORK AT TERMINAL B, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 08/16/2023 | $934,600 |
AP2403-C1 | Construction 149/30 | ENGINE MAINTENANCE AND REPAIRS FOR GENERATORS, ALL MASSPORT PROPERTIES, BOSTON, BEDFORD, FRAMINGHAM, AND WORCESTER, MASSACHUSETTS | 08/16/2023 | $1,315,400 |
L1824 | Professional Consultant | GSE Maintenance Building | 08/10/2023 | $2,000,000 |
L1694-C3 | Construction 149/30 | Filed Sub BIds: PARTIAL ROOF REPLACEMENT AND ASSOCIATED WORK AT TERMINAL B, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 08/09/2023 | $934,600 |
M658-C2 SUB | Construction 149/30 | Filed Sub BIds: BOSTON FISH PIER DOOR REHABILITATION, 212 NORTHERN AVENUE, BOSTON, MASSACHUSETTS | 08/09/2023 | $900,000 |
A446 | Professional Consultant | TERM SIGNAGE DESIGN SERVICES | 07/27/2023 | $1,000,000 |
M707-C1 | Construction 149/30 | General: SOUTH BOSTON WATERFRONT TRANSPORTATION CENTER SIGNAGE IMPROVEMENTS, 503 CONGRESS STREET, BOSTON, MASSACHUSETTS 02210 | 07/26/2023 | $1,300,000 |
L1828 | Professional Consultant | 2023 Airfield Capital Improvement Projects | 07/13/2023 | $2,000,000 |
M705-C1 | Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT MPA FISH PIER EAST, BOSTON FISH PIER, 212 NORTHERN AVENUE, SOUTH BOSTON, MASSACHUSETTS | 07/13/2023 | $3,555,200 |
M689-C1 | Construction 149/30 | BERTH 12 PAVEMENT REHABILITATION, CONLEY TERMINAL, SOUTH BOSTON, MASSACHUSETTS | 07/12/2023 | $5,260,000 |
M707-C1 | Construction 149/30 | SUB BIDS: SOUTH BOSTON WATERFRONT TRANSPORTATION CENTER SIGNAGE IMPROVEMENTS, 503 CONGRESS STREET, BOSTON, MASSACHUSETTS 02210 | 07/12/2023 | $1,300,000 |
HP2400-C1 | Construction 149/30 | INSTALLATION OF PLANTINGS AND ASSOCIATED PROTECTIVE FENCING JORDAN CONSERVATION AREA (JCA), L.G. HANSCOM FIELD | 07/12/2023 | $80,000 |
M483-C1 | Construction 149/30 | CYPHER & E STREET RECONSTRUCTION, BOSTON MASSACHUSETTS | 06/28/2023 | $23,900,000 |
A447 | Professional Consultant | Term Roofing and Building Envelope Consulting Services | 06/22/2023 | $2,000,000 |
M711 | Professional Consultant | Hoosac Pier Bulkhead Rehabilitation | 06/08/2023 | $2,000,000 |
AP2401-C1 | Construction 149/30 | SELECT HYDRANT & GATE VALVE REPLACEMENT TERM CONTRACT, BEDFORD, BOSTON & WORCESTER, MASSACHUSETTS | 06/07/2023 | $675,000 |
AP2402-C1 | Construction 149/30 | FY24-26 WATERFRONT REPAIR TERM CONTRACT, BOSTON, MASSACHUSETTS | 05/31/2023 | $1,225,000 |
AP2305-C1 | Construction 149/30 | TERM CAULKING/SEALANT REPAIRS, BOSTON, BEDFORD, BRAINTREE, CHELSEA, FRAMINGHAM, PEABODY, WORCESTER AND WOBURN, MASSACHUSETTS | 05/31/2023 | $1,500,000 |
A443 | Professional Consultant | Third Party Commissioning Consulting Services FY23-25, All Massport Owned and Operated Facilities | 05/26/2023 | $1,000,000 |
AP2302-C1 | Construction 149/30 | TERM INTERIOR BUILDING REPAIRS, BOSTON, BEDFORD, AND WORCESTER MASSACHUSETTS | 05/24/2023 | $2,000,000 |
L1802 | Professional Consultant | PRESCOTT STREET BUILDING FIT-OUT, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 04/20/2023 | $1,000,000 |
L1738-C1 | Construction 149/30 | ENERGY OPTIMIZATION PROGRAM – LOGAN AIRSIDE CHARGING STATIONS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 04/19/2023 | $4,300,000 |
LP2301 | Contractor/Vendor RFQ | FY24-27 Passenger Boarding Bridges and Baggage Handling System | 04/12/2023 | $21,000,000 |
L1740-C1 | Construction 149/30 | LOC CRAC UNIT REPLACEMENT, ONE HARBORSIDE DRIVE, BOSTON, MASSACHUSETTS | 03/29/2023 | $4,600,000 |
L1709-C1 | Construction 149/30 | MISCELLANEOUS AIRFIELD PAVEMENT IMPROVEMENTS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 03/22/2023 | $3,400,000 |
W308-C1 | Construction 149/30 | RUNWAY 29 REHABILITATION (APPROXIMATELY 3720’ x 150’), WORCESTER, MASSACHUSETTS | 03/22/2023 | $11,100,000 |
AP2209-C1 | Construction 149/30 | FY2023-2026 TERM CONTRACT FOR ON-CALL AND EMERGENCY ENVIRONMENTAL SERVICES AND MAINTENANCE SERVICES, ALL MASSACHUSETTS PORT AUTHORITY FACILITIES, BOSTON, BEDFORD, CHELSEA, FRAMINGHAM, AND WORCESTER, MASSACHUSETTS | 03/08/2023 | $2,900,000 |
H288-C1 | Construction 149/30 | RUNWAY 5-23 (SOUTH OF RW 11-29) REHAB, LIGHTING AND TW E GEOMETRY IMPROVEMENTS, LAURENCE G. HANSCOM FIELD, BEDFORD, MASSACHUSETTS | 03/08/2023 | $8,000,000 |
MP2301-C1 | Construction 149/30 | MARITIME PAVEMENT REPAIRS - TERM CONTRACT, MASSACHUSETTS PORT AUTHORITY FACILITIES, SOUTH BOSTON, MA | 03/08/2023 | $2,500,000 |
AP2304-C1R | Construction 149/30 | TERM DOOR REPLACEMENT, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS | 02/22/2023 | $500,000 |
L1694-C2 | Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 62, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 02/08/2023 | $2,580,000 |
L1645-C1 | Construction 149/30 | REHABILITATE RUNWAY 15R-33L AND ASSOCIATED GEOMETRY IMPROVEMENTS, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON MASSACHUSETTS | 02/08/2023 | $62,000,000 |
M727-C1 | Construction 149/30 | NEW CRUISE TERMINAL ESCALATOR, FLYNN CRUISEPORT BOSTON, 1 BLACK FALCON AVENUE, SOUTH BOSTON, MASSACHUSETTS | 02/01/2023 | $4,600,000 |
LP2300-C1 | Construction 149/30 | NOTICE TO CONTRACTORS Electronic General Bids for MPA CONTRACT NO. LP2300-C1, FY2023-2025 RUNWAY/TAXIWAY SAFETY AREA INFIELD MAINTENANCE TERM CONTRACT, LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 02/01/2023 | $1,000,000 |
AP2205-C1 | Construction 149/30 | TERM MECHANICAL CONTRACT, ALL MASSPORT FACILITIES IN BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN AND WORCESTER, MASSACHUSETTS | 01/25/2023 | $2,700,000 |
L1694-C2 | Construction 149/30 | ROOF REPLACEMENT AND ASSOCIATED WORK AT BUILDING 62, BOSTON LOGAN INTERNATIONAL AIRPORT, EAST BOSTON, MASSACHUSETTS | 01/25/2023 | $2,580,000 |
M727-C1 | Construction 149/30 | NEW CRUISE TERMINAL ESCALATOR, FLYNN CRUISEPORT BOSTON, 1 BLACK FALCON AVENUE, SOUTH BOSTON, MASSACHUSETTS | 01/18/2023 | $4,600,000 |
AP2304-C1 | Construction 149/30 | TERM DOOR REPLACEMENT, BOSTON, BEDFORD AND WORCESTER, MASSACHUSETTS | 01/18/2023 | $500,000 |
AP2205-C1 | Construction 149/30 | TERM MECHANICAL CONTRACT, ALL MASSPORT FACILITIES IN BEDFORD, BOSTON, BRAINTREE, FRAMINGHAM, PEABODY, WOBURN AND WORCESTER, MASSACHUSETTS | 01/11/2023 | $2,700,000 |
AP2301-C1 | Construction 149/30 | TERM ABATEMENT, MASSACHUSETTS | 12/21/2022 | $2,332,675 |
L1622-C2 | Construction 149/30 | Terminal A Pre Check Checkpoint- Phase 2 | 12/14/2022 | $1,800,000 |
L1622-C2 | Construction 149/30 | L1622-C2 Terminal A Pre Check Checkpoint- Phase 2 ( SUB BIDS) | 12/09/2022 | $1,800,000 |
AP2207-C1 | Construction 149/30 | LOW VOLTAGE ELECTRICAL MAINTENANCE TERM CONTRACT ALL MASSPORT PROPERTIES | 12/07/2022 | $3,000,000 |
L1758-C1 | Construction 149/30 | LOGAN AIRPORT ROADWAYS REHABILITATION, LOGAN INTERNATIONAL AIRPORT | 11/16/2022 | $11,500,000 |