Conley Terminal Berth 12 Maintenance Dredging
Contract: M534-C1
Location: Maritime
M534-C1 (14.6k) updated Thursday, July 10, 2014
M534-C1 8 1 2014 Resposes to Questions (21.6k) updated Friday, August 01, 2014
Opportunity Type Construction
Advertised Date 7/10/2014
Bid Date 8/6/2014
Sub Bid Date
Qualification Due
Qualification Location
Pre-Bid Conference
Conley Terminal 940 East 1st Street, South Boston, MA 02127
Bid Opening
Capital Programs Dept, LOC, One Harborside Drive, East Boston, MA 02128
Sub Bid Opening
Bid Info Links
Sub Bid Info
Scope of Work The work includes dredging of roughly 6,500 CY of sediment material, by mechanical method, using a closed environmental bucket, and disposal of dredged material by dump scow to the confined aquatic disposal (cad) location in conformance with us army corps of engineers (usace) requirements.

Awarded To:

General Contractor Burnham Associates
Contract Value $483,500
Contract Awarded Date 9/23/2014