Capital Programs

Capital Programs » L1255-C2

Terminal C Connectors
Contract: L1255-C2
Location: Logan Airport
Documents:
L1255-C2Logan Term C Connectors Information (9144.9k) updated Friday, January 31, 2014
Opportunity Type Construction Manager at Risk
Advertised Date 10/24/2013
Bid Date
Sub Bid Date
Qualification Due 12/4/2013 12:00 PM
Qualification Location Capital Programs Dept, Logan Office Center, One Harborside Dr, Suite 209S, E Boston MA
Pre-Bid Conference
11/13/2013
10:00AM
Capitl Programs Dept. Logan Office Center, One Harborside Dr, Suite 209S E Boston MA
Bid Opening
Sub Bid Opening
Bid Info Links
PlanHolders
Sub Bid Info
Shortlisted
Scope of Work The proposed project includes construction of post security concourses between Terminal C (at Pier B) and Terminal E, and between Terminal C from Pier C to Pier D, including improvements to Terminal C at hold rooms, concessions, toilets and concourse. This post-security connectivity will allow customers to have seamless access to all Terminal C gates; therefore, any gate changes or connecting passengers can move behind security to all 24 gates. This project will also allow certain pre-cleared international arriving passengers to connect to departures from Terminal C and allow all arriving passengers to connect to international departures at Terminal E. The project will incorporate sustainable design elements. The work includes general site and interior preparation, foundations, utility relocations, construction phasing and sequencing, walkway structures, architecture, pedestrian circulation/wayfinding, means of egress, signage/graphics, stairs, elevators, escalators, ADA and code compliance, HVAC, plumbing, fire protection, electrical, lighting, power, security, and other systems and facilities required by existing codes and regulations and necessary to achieve a complete functional facility. Construction of the new work will also impact existing facilities and also existing ramp activity and it is essential that the work be designed and constructed in such a manner that all required operations and ramp activity will be maintained with no permanent obstructions to current and future ramp activity.
Contact CPBidQuestions@massport.com
Awarded To:
General Contractor
Contract Value  
Contract Awarded Date