Capital Programs

Capital Programs » L1227-S1

System Integration Services Master Building
Contract: L1227-S1
Location: Logan Airport
Documents:
L1227-S1 (17.2k) updated Friday, November 29, 2013
L1227-S1 Attachment A - Technical Specifications (544.9k) updated Wednesday, December 11, 2013
L1227-S1 Attachment B - Contract Provisions (128.3k) updated Wednesday, December 11, 2013
L1227-S1 RFP 1 CONTRACT PROVISIONS (622.2k) updated Wednesday, December 11, 2013
L1227-S1 Responses to Questions 01-15-2014 (62k) updated Thursday, January 16, 2014
L1227-S1 2014-01-07 RFP Mtg materials (1979.2k) updated Thursday, January 16, 2014
Exhibits for RFP_Protected (610.5k) updated Thursday, January 16, 2014
Opportunity Type RFQ
Advertised Date 11/29/2013
Bid Date
Sub Bid Date
Qualification Due 1/28/2014 12:00 PM
Qualification Location Capital Programs Dept, Logan Office Center, One Harborside Drive, Suite 209S E Boston MA
Pre-Bid Conference
1/7/2014
11:00AM
Capital Programs Dept, Logan Office Center, One Harborside Dr, Suite 209S, E Boston MA
Bid Opening
Sub Bid Opening
Bid Info Links
PlanHolders
Bid Info
Sub Bid Info
Shortlisted
Scope of Work The Authority is seeking a qualified vendor to implement a Master Building Control System at Logan International Airport. The Vendor shall have proven experience in the provision and installation of an enterprise building control management system, and integration of the system with legacy building controls. The Vendor must be able to work closely with the Authority and existing Building Management Systems in order to provide such services in a timely and effective manner. The Authority maintains a large campus of buildings at Logan International Airport, East Boston, MA. The Airport is currently equipped with a myriad of legacy building control systems and devices that have been installed over time. The Authority is undertaking a program to integrate existing building HVAC controls into a campus-wide Master Building Control System (MBCS) in order to improve energy efficiency, increase effectiveness in monitoring and controlling HVAC components, and standardize Massport’s hardware and controls management system software onto a modern technology platform. The move to a comprehensive MBCS will be a multi-phased effort.
Contact CPBidQuestions@massport.com
Awarded To:
General Contractor
Contract Value  
Contract Awarded Date